Jervis Pump Station Upgrade

 

 

Jervis Pump Station UpgradeJervis Pump Station Upgrade<div class="ExternalClass13F1D0FCFC224D56AA2D9E8B8136F9AA"><p>​The Jervis Pump Station helps to safely move wastewater from the City of Vancouver to the Iona Island Wastewater Treatment Plant. Construction will begin in 2019 and will involve adding a back-up power supply to the existing pump station to provide a reliable power supply during power outages.</p><p>Construction will take approximately six months and will require the existing building to be expanded. </p><p>Metro Vancouver is working closely with Vancouver Park Board staff to ensure that design of the new and old building is well integrated into the surroundings of Sunset Beach Park. The design will enhance the experience of visitors at this location while preserving the natural beauty of the park.</p></div>

 

 

Maphttp://www.gazon.co.ua/services/liquid-waste/construction-maintenance/ConstructionProjectPictures/_t/Map_-_Jervis_Pump_Station_-_2018-03-21_jpg.jpghttp://www.gazon.co.ua/services/liquid-waste/construction-maintenance/ConstructionProjectPictures/Forms/DispForm.aspx?ID=32&RootFolder=/services/liquid-waste/construction-maintenance/ConstructionProjectPicturesMap

 

 

<div class="ExternalClass293E25784AAA413981304ED3D1E220F5"><p>​Associated construction impacts may include:</p><ul><li>construction vehicles in the area</li><li>survey work in the area</li><li>noise</li></ul></div><div class="ExternalClass78E5C40EB5254EC0AE17E67AA1270ECD"><p>​Work will generally occur between Monday to Saturday from 7:00 a.m. to 8:00 p.m. and Sunday 10:00 a.m. to 8:00 p.m. However, there may be times when crews will need to work longer hours or on weekends to complete certain sections of work. Residents will receive notifications if longer work hours are required. </p></div><div class="ExternalClass6712F07B944E44E0B5D295C9955BD1E1"><p> This spring, there will be a number of opportunities for the public to provide feedback on the proposed building design and on ways Metro Vancouver can minimize construction impacts. To receive updates about this project, please email <a style="display:none" href="mailto:[email protected]">[email protected]</a> with the subject “Jervis Pump Station”.</p></div>

 

 

Spring 2018 – Fall 2019

 

 

 

 

<div class="ExternalClassEBA41132A7A84C6DB388A0900E715C7F"><p>Metro Vancouver Information Centre<br>Monday to Friday (8:00 a.m. - 4:30 p.m.) <br>111.111.1111<br>After-hours Emergencies: 604-451-6610<br>Email: <a style="display:none" href="mailto:[email protected]?subject=Jervis%20Pump%20Station">Information Centre</a></p></div>

Stay Connected


Subscribe to our mailing list to receive e-newsletters about our Liquid Waste engagement projects

 

Sign up
поливная система

у нас np.com.ua

шторы для зала с двумя окнами